WELCOME TO OUR WEBSITE !    |   ABOUT US   |   CONTACT US
How long does it typically take to manufacture a medical stent?
You are here: Home » Blog » Esophageal Stent » How long does it typically take to manufacture a medical stent?

BLOG SEARCH

How long does it typically take to manufacture a medical stent?

Views: 1     Author: Site Editor     Publish Time: 2024-12-09      Origin: Site

How long does it typically take to manufacture a medical stent?

The time it takes to manufacture a medical stent depends on the type of stent, the materials used, and the manufacturing processes involved. Here’s a general breakdown:

1. Material Preparation (1–2 weeks):

  • Metallic Stents: Fabrication of materials like stainless steel, cobalt-chromium, or nitinol. These are often laser-cut from tubes.

  • Polymeric Stents: Preparation of biocompatible and biodegradable polymers.

2. Design and Fabrication (1–4 weeks):

  • Laser Cutting: Metallic stents are often cut into intricate designs using high-precision lasers. This step typically takes a few days but could extend depending on complexity.

  • 3D Printing: Used for some polymer stents or customized designs; this process can take several hours to a few days.

  • Coiling: Wire-based stents may be coiled or braided, which can be faster but still requires precision.

3. Surface Treatment (1–3 weeks):

  • Coating: Drug-eluting stents require a coating process to apply medications. The time depends on the type of drug, coating layers, and curing processes.

  • Polishing and Cleaning: Essential for ensuring the stent is biocompatible and free from contaminants.

4. Quality Control and Testing (2–4 weeks):

  • Stents undergo rigorous quality checks, including strength, flexibility, and biocompatibility testing.

  • Regulatory standards demand stress testing, fatigue testing, and drug-release profiling (if applicable).

5. Packaging and Sterilization (1–2 weeks):

  • Once the stents are approved, they are packaged and sterilized using methods such as ethylene oxide, gamma irradiation, or autoclaving.

Total Time:

Depending on the complexity and type, manufacturing a batch of medical stents can take 6 to 12 weeks from start to finish. However, custom or experimental stents may take longer due to additional design and testing requirements.


Contact us quickly to get the latest product quotation !
Leave a Message
Contact us

PRODUCTS

LINKS

CONTACT

Company Address: Room 302 , 3rd Floor, Building 6, No. 688, Bin an Road Hangzhou, China
Postal Code: 310052
Whatsapp/Wechat: +86-17767267187
Email:ljh@tangjimedical.com
Office:+86-571 87839895
Copyright © 2017-2022 Hangzhou Tangji Medical Technology Co., Ltd.. All rights reserved.